Development Technology

  • Aspherical lens process construction view
  • 1. 1st Insert Injection/Settled
  • 2. 2nd Forming
  • 3. Laser cutting
  • 4. Vision Inspection
  • 5. Automation Output

Development Background

  • Dramatical shortening of C/T (600sec → 300sec) by applying and existing single injection : insert method
  • Automated mass production using articulated robots in the entire production process (3 robots, 14 axis control)
  • Minimize investment cost & secure maintenance capability through self-design and manufacturing process

Customer Contribution

  • Quality Improvement : Achieving balanced quality condition through automation process
  • Cost reduction : C/T reduction by 50% compared to the existing method, contributing to customer cost reduction through unmanned production